{"id":8589,"date":"2016-10-14T19:04:00","date_gmt":"2016-10-14T11:04:00","guid":{"rendered":"http:\/\/primer.com.ph\/blog\/?p=8589"},"modified":"2016-10-14T19:04:00","modified_gmt":"2016-10-14T11:04:00","slug":"mrt-3-targets-to-operate-22-trains-this-month","status":"publish","type":"post","link":"https:\/\/primer.com.ph\/blog\/2016\/10\/14\/mrt-3-targets-to-operate-22-trains-this-month\/","title":{"rendered":"MRT-3 targets to operate 22 trains this month"},"content":{"rendered":"<p>Heavy traffic has been the daily struggle of commuters in the Philippines. With different modes of transportation\u2014both public and private vehicles\u2014out on streets to accommodate a big population, roads became seriously congested especially in the metro.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-8590\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/10\/MRT-3_Train_North_Avenue_1.jpg\" alt=\"mrt-3_train_north_avenue_1\" width=\"800\" height=\"535\" srcset=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/10\/MRT-3_Train_North_Avenue_1.jpg 800w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/10\/MRT-3_Train_North_Avenue_1-300x201.jpg 300w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/10\/MRT-3_Train_North_Avenue_1-768x514.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/p>\n<p style=\"text-align: center\">MRT-3. DOT is set to improve services in the MRT Line 3 System. Image grabbed from <a href=\"https:\/\/commons.wikimedia.org\/wiki\/File:MRT-3_Train_North_Avenue_1.jpg\">Wikimedia<\/a><\/p>\n<p>To alleviate this problem, the Department of Transportation (DOT) has been exerting efforts to improve services in the Metro Rail Transit (MRT) Line 3 system with the assistance from maintenance provider, Busan Universal Rail, Inc.<\/p>\n<p>Busan spokesperson Charles Perfecto Mercado, said that a maximum of 22 trains are targeted to operate within this month. Also, during peak hours, commuters can be rest assured that 20 trains will be running.<\/p>\n<p>Currently, there are 18 trains in operation during peak hours and a maximum of 20 trains in MRT-3. However, these are still not enough to occupy more than 650,000 passengers daily.<\/p>\n<p>Meanwhile, development plans for MRT-3 are still ongoing as DOT waits for the delivery of power supply meant for the use of 4-car trains. These longer trains are expected to be deployed by mid-next year to increase capacity.<\/p>\n<p>&nbsp;<\/p>\n<p>Source: <a href=\"http:\/\/www.bworldonline.com\/content.php?section=Corporate&amp;title=MRT-3-to-get-full-complement-of-trains-this-month&amp;id=134737\">BusinessWorld<\/a>, <a href=\"http:\/\/thestandard.com.ph\/business\/218567\/busan-to-deploy-more-mrt-trains.html\">The Standard<\/a>, <a href=\"http:\/\/www.rappler.com\/business\/industries\/148952-longer-mrt-trains-operational-mid-2017-dotr\">Rappler<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Heavy traffic has been the daily struggle of commuters in the Philippines. With different modes of transportation\u2014both public and private vehicles\u2014out on streets to accommodate a big population, roads became seriously congested especially in the metro. MRT-3. DOT is set to improve services in the MRT Line 3 System. Image grabbed from Wikimedia To alleviate this problem, the Department of Transportation (DOT) has been exerting efforts to improve services in the Metro Rail Transit (MRT) Line 3 system with the assistance from maintenance provider, Busan Universal Rail, Inc. Busan spokesperson Charles Perfecto Mercado, said that a maximum of 22 trains are targeted to operate within this month. Also, during peak [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":8590,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-8589","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-current-events"],"acf":[],"jetpack_featured_media_url":"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/10\/MRT-3_Train_North_Avenue_1.jpg","_links":{"self":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/8589","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/comments?post=8589"}],"version-history":[{"count":2,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/8589\/revisions"}],"predecessor-version":[{"id":8648,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/8589\/revisions\/8648"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media\/8590"}],"wp:attachment":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media?parent=8589"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/categories?post=8589"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/tags?post=8589"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}