{"id":41041,"date":"2019-03-14T09:08:41","date_gmt":"2019-03-14T01:08:41","guid":{"rendered":"http:\/\/primer.com.ph\/blog\/?p=41041"},"modified":"2019-03-14T13:17:52","modified_gmt":"2019-03-14T05:17:52","slug":"nlex-increases-toll-fees-effective-march-20","status":"publish","type":"post","link":"https:\/\/primer.com.ph\/blog\/2019\/03\/14\/nlex-increases-toll-fees-effective-march-20\/","title":{"rendered":"NLEX Increases Toll Fees, Effective March 20"},"content":{"rendered":"<p style=\"text-align: justify\"><strong>NLEX Corporation<\/strong> will soon implement a toll hike,\u00a0with an additional <strong>Php 10<\/strong> payment in the open system and <strong>Php 0.18 per kilometer<\/strong> in the closed system, starting<strong> March 20, 2019<\/strong>. Said increases have been approved by the<span style=\"font-weight: 400\"> Toll Regulatory Board (TRB).<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter  wp-image-41042\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2019\/03\/Toll-hike-NLEX.jpg\" alt=\"\" width=\"677\" height=\"361\" srcset=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2019\/03\/Toll-hike-NLEX.jpg 507w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2019\/03\/Toll-hike-NLEX-300x160.jpg 300w\" sizes=\"auto, (max-width: 677px) 100vw, 677px\" \/><\/p>\n<p>The Php 10 increase is inclusive of\u00a0the add-on toll rate of Php 6 following the completion of the Harbor Link Segment 10; and Php 4 (open system) and Php 0.18 per kilometer (closed system) from the approved periodic adjustments that were originally due in 2013 and 2015.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-41060\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2019\/03\/NLEX.jpg\" alt=\"\" width=\"960\" height=\"540\" \/><\/p>\n<p style=\"text-align: center\"><em><span style=\"font-size: 10pt\">NLEX Harbor Link IMAGE NLEX Corporation<\/span><\/em><\/p>\n<p>The following are the\u00a0additional rates for open system traversing within Quezon City to Marilao sections:<\/p>\n<p>Class 1 (ordinary cars): +Php 10<br \/>\nClass 2 (buses and small trucks): +Php 23<br \/>\nClass 3 (large trucks\/trailers): +Php 29<\/p>\n<p style=\"text-align: justify\">The open system includes high traffic congestion areas like Balintawak, Mindanao Ave., Karuhatan, Valenzuela, Caloocan, Meycauayan and Marilao interchanges and toll plazas.<\/p>\n<p>Meanwhile, the additional rates for closed system traveling end to end or between EDSA Balintawak to Sta. Ines Mabalacat City are as follows:<\/p>\n<p>Class 1: +Php\u00a022<br \/>\nClass 2: +Php\u00a056<br \/>\nClass 3: +Php\u00a067<\/p>\n<p style=\"text-align: justify\">NLEX Corporation, which was previously known as Manila North Tollways Corporation, is the builder and holder of the NLEX and Subic-Clark-Tarlac Expressway (SCTEX).<\/p>\n<p style=\"text-align: justify\"><em>Also read:\u00a0<a href=\"https:\/\/primer.com.ph\/blog\/2019\/01\/14\/nlex-slex-connector-road-project-links-c3-road-caloocan-to-santa-mesa-and-skyway-stage-3\/\">NLEX-SLEX Connector Road Project to Link C3 Road Caloocan to Santa Mesa and Skyway Stage 3<\/a><\/em><\/p>\n<hr \/>\n<p><span style=\"font-size: 10pt\"><em>This is a press release. Minor edits were made prior to publishing.\u00a0<\/em><\/span><br \/>\n<span style=\"font-size: 10pt\"><em>Featured image grabbed from NLEX Corporation<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NLEX Corporation will implement a toll hike, adding an additional Php 10 payment in the open system and Php 0.18 per kilometer in the closed system, starting March 20, 2019. Said increases have been approved by the Toll Regulatory Board (TRB).<\/p>\n","protected":false},"author":3,"featured_media":41060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[1754,8428,2577],"class_list":["post-41041","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-current-events","tag-nlex","tag-nlex-corporation","tag-north-luzon-expressway-nlex"],"acf":[],"jetpack_featured_media_url":"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2019\/03\/NLEX-e1552540608881.jpg","_links":{"self":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/41041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/comments?post=41041"}],"version-history":[{"count":6,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/41041\/revisions"}],"predecessor-version":[{"id":41067,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/41041\/revisions\/41067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media\/41060"}],"wp:attachment":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media?parent=41041"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/categories?post=41041"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/tags?post=41041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}