{"id":16413,"date":"2017-05-06T10:00:36","date_gmt":"2017-05-06T02:00:36","guid":{"rendered":"http:\/\/primer.com.ph\/blog\/?p=16413"},"modified":"2017-05-05T14:02:34","modified_gmt":"2017-05-05T06:02:34","slug":"p65-billion-lrt-1-cavite-extension-breaks-ground","status":"publish","type":"post","link":"https:\/\/primer.com.ph\/blog\/2017\/05\/06\/p65-billion-lrt-1-cavite-extension-breaks-ground\/","title":{"rendered":"P65-billion LRT-1 Cavite Extension breaks ground"},"content":{"rendered":"<p>If you\u2019ve been living in Para\u00f1aque, Las Pi\u00f1as, and Cavite and have been continually struggling with getting to other parts of Metro Manila, then you\u2019re in for a treat. Prepare to breathe a sigh of relief (for now) as construction will soon start for the LRT-1 Cavite Extension project.<\/p>\n<p style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-16417\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/1-2.jpg\" alt=\"\" width=\"600\" height=\"336\" srcset=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/1-2.jpg 600w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/1-2-300x168.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The P65-billion extension project for LRT-1 has finally started after six year\u2019s worth of delays. No less than Transportation Secretary Arthur Tugade led the groundbreaking ceremonies last May 4 in Brgy. San Dionisio, Para\u00f1aque City together with officials from Light Rail Manila Corp., who will handle the project.<\/p>\n<p style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-16415\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/3_resized.jpg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/3_resized.jpg 600w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/3_resized-290x218.jpg 290w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/3_resized-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>&#8220;A well-meaning partnership between private sector and government can fast-track the projects. <em>Naniniwala kami na kung tatapusin ang mga konstruksyon at imprastraktura sa lalong madaling panahon<\/em> without sacrificing quality and cost, <em>sa lalong madaling panahon<\/em>, the benefits will immediately accrue to the people,&#8221; the DOTr Secretary said.<\/p>\n<p>(A well-meaning partnership between the private sector and the government can fast-track [government] projects. We believe that if we can finish the construction of infrastructure projects as fast as possible without sacrificing quality and cost, the benefits will immediately accrue to the people.)<\/p>\n<p>The 11-kilometer railway project was designed to extend the current LRT Line 1 from Redemptorist, Baclaran in Para\u00f1aque all the way up to Niog in Bacoor, Cavite. It is expected to serve around 300,000-410,000 passengers daily, pushing LRT-1\u2019s load to over 800,000.<\/p>\n<p style=\"text-align: center\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-16418\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/2-2.jpg\" alt=\"\" width=\"600\" height=\"566\" srcset=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/2-2.jpg 600w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/2-2-300x283.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>The extension will add eight stops to the existing 20 stations: ASEANA, MIA, Asia World, Ninoy Aquino, and Dr. A. Santos stations in Para\u00f1aque City; Las Pi\u00f1as and Zapote stations in Las Pi\u00f1as City; and Niog station in Bacoor, Cavite.<\/p>\n<p>The project was approved by the National Economic and Development Authority last 2011, but was held back due to right-of-way issues with the local government units involved. Construction of the project is expected to start in June 2017, with a target completion date slated for October 2021.<\/p>\n<hr \/>\n<p><span style=\"font-size: 10pt\"><em>Source: Department of Transportation, <a href=\"http:\/\/newsinfo.inquirer.net\/894510\/lrt-1-extension-to-cavite-finally-under-way\">Philippine Daily Inquirer<\/a>, <a href=\"http:\/\/news.abs-cbn.com\/business\/05\/04\/17\/lrt-1-extension-to-cavite-to-begin-construction\">ABS-CBN News<\/a>, <a href=\"http:\/\/cnnphilippines.com\/news\/2017\/05\/04\/P65-billion-light-rail-manila-cavite.html\">CNN Philippines<br \/>\n<\/a><\/em><\/span><span style=\"font-size: 10pt\"><em>All images grabbed from the Department of Transportation&#8217;s Facebook page<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you\u2019ve been living in Para\u00f1aque, Las Pi\u00f1as, and Cavite and have been continually struggling with getting to other parts of Metro Manila, then you\u2019re in for a treat.<\/p>\n","protected":false},"author":3,"featured_media":16414,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[38,5],"tags":[],"class_list":["post-16413","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-launching-and-opening","category-news-and-current-events"],"acf":[],"jetpack_featured_media_url":"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2017\/05\/3-1.jpg","_links":{"self":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/16413","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/comments?post=16413"}],"version-history":[{"count":1,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/16413\/revisions"}],"predecessor-version":[{"id":16419,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/16413\/revisions\/16419"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media\/16414"}],"wp:attachment":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media?parent=16413"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/categories?post=16413"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/tags?post=16413"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}