{"id":11366,"date":"2016-12-27T10:53:23","date_gmt":"2016-12-27T02:53:23","guid":{"rendered":"http:\/\/primer.com.ph\/blog\/?p=11366"},"modified":"2016-12-28T16:47:42","modified_gmt":"2016-12-28T08:47:42","slug":"toll-free-at-naia-expressway-phase-2-b-for-a-month","status":"publish","type":"post","link":"https:\/\/primer.com.ph\/blog\/2016\/12\/27\/toll-free-at-naia-expressway-phase-2-b-for-a-month\/","title":{"rendered":"Toll-free at NAIA Expressway Phase 2-B until Jan. 10, 2017"},"content":{"rendered":"<p>In a report published by <a href=\"http:\/\/www.businessmirror.com.ph\/smc-opens-phase-2-b-of-naiax-waives-toll-fee-for-one-month\/\">Business Mirror<\/a>, the newly completed NAIA Expressway\u2019s Phase 2-B, link from NAIA Road to NAIA Terminal 3, Villamor and the Skyway System, will be toll-free. This will be from Decemeber 21, 2016 to Jan. 10, 2017, a representative from the Department of Transportation said.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-11515\" src=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/12\/naia-2.jpg\" alt=\"naia-2\" width=\"1366\" height=\"768\" srcset=\"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/12\/naia-2.jpg 1366w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/12\/naia-2-300x169.jpg 300w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/12\/naia-2-768x432.jpg 768w, https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/12\/naia-2-1024x576.jpg 1024w\" sizes=\"auto, (max-width: 1366px) 100vw, 1366px\" \/><\/p>\n<p style=\"text-align: center\">\n<p style=\"text-align: left\">According to San Miguel Corporation President and COO Ramon S. Ang, \u201ctoll will be free for motorists coming from the Skyway and the Villamor area, going to Macapagal and NAIA Terminal 1 and 2.\u201d<\/p>\n<p>He added that vehicles coming from Macapagal and Terminals 1 and 2 going to NAIA Terminal 3, Villamor and Skyway, will also be able to pass, toll-free.<\/p>\n<p>Meanwhile, <a href=\"http:\/\/newsinfo.inquirer.net\/856281\/motorists-reminded-naia-expressway-t3-link-open-fees-waived-for-1-month\">Philippine Daily Inquirer<\/a> reported that motorists will continue paying the regular toll of P35 when they use NAIAX Phase 2-A, the segment that connects Macapagal Road to Terminals 1 and 2.<\/p>\n<p>The NAIA Expressway Project, according to <a href=\"https:\/\/ppp.gov.ph\/?ppp_projects=naia-expressway-project-phase-ii\">ppp.gov.ph<\/a>, is a 4-lane, 7.75 km elevated expressway and 2.22 km at-grade feeder road providing access to NAIA Terminals 1, 2 and 3, and linking the Skyway and the Manila-Cavite Toll Expressway.<\/p>\n<p><iframe loading=\"lazy\" title=\"NAIA Expressway Phase 2B opening 12.21.2016\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/pRIN4EPOqN4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p><em>NAIA Expressway Phase 2-B Opening. Video grabbed from\u00a0<a class=\"g-hovercard yt-uix-sessionlink spf-link \" href=\"https:\/\/www.youtube.com\/channel\/UCYnXenMHWRq-Ky0qQnoACvg\">dmitrivalencia<\/a><\/em><\/p>\n<p>&nbsp;<\/p>\n<p><em>Source: <a href=\"http:\/\/www.businessmirror.com.ph\/smc-opens-phase-2-b-of-naiax-waives-toll-fee-for-one-month\/\">Business Mirror<\/a>, <a href=\"http:\/\/newsinfo.inquirer.net\/856281\/motorists-reminded-naia-expressway-t3-link-open-fees-waived-for-1-month\">Philippine Daily Inquirer<\/a>, <a href=\"https:\/\/ppp.gov.ph\/?ppp_projects=naia-expressway-project-phase-ii\">ppp.gov.ph<\/a><\/em><\/p>\n<p><em>Also read: <a href=\"https:\/\/primer.com.ph\/blog\/2016\/09\/15\/naiax-toll-will-be-free-for-1-month-starting-sept-22\/\">NAIAX toll will be free for 1 month starting Sept 22<\/a><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The newly completed NAIA Expressway\u2019s Phase 2-B, link from NAIA Road to NAIA Terminal 3, Villamor and the Skyway System, will be toll-free for a month.<\/p>\n","protected":false},"author":3,"featured_media":11394,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[1549,1694,1696,1695],"class_list":["post-11366","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-and-current-events","tag-naia-expressway","tag-naia-expressway-phase-2-b","tag-naia-expressway-toll-free","tag-naia-expressways-phase-2-a"],"acf":[],"jetpack_featured_media_url":"https:\/\/primer.com.ph\/blog\/wp-content\/uploads\/sites\/14\/2016\/12\/naiax-e1556522770780.jpg","_links":{"self":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/11366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/comments?post=11366"}],"version-history":[{"count":18,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/11366\/revisions"}],"predecessor-version":[{"id":11379,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/posts\/11366\/revisions\/11379"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media\/11394"}],"wp:attachment":[{"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/media?parent=11366"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/categories?post=11366"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/primer.com.ph\/blog\/wp-json\/wp\/v2\/tags?post=11366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}